GTC upgraded the heating and cooling systems for the Ohio National Guard Beightler Armory with the new Variable Refrigerant Volume Systems (VRV) and installed 12 new air handler units (AHU’s).
GTC installed of the systems while working around a fully functional military building and coordinating access to sensitive areas, all without disturbing military operations.